Skip to content
Monday – Friday: 8 a.m. – 4:30 p.m. · Saturday – Sunday: ClosedMonday – Friday: 8 a.m. – 4:30 p.m.Section 608 technician certification · NY Certificate 000000VerifyLiability and workers’ compensation insurance
1 more license
  • Section 608 technician certification · NY Certificate 000000Verify
  • Liability and workers’ compensation insurance
(607) 555-0100

Ithaca, New York

Heating a church, school or hall from the ground.

Small institutions pay for heat all winter and decide slowly. We write for that: one proposal a board can read in a meeting, with the scope, the schedule and what is left out, and an air-source option beside it so the comparison is already done.

White corridor with insulated rectangular ductwork along the ceiling

What a board packet holds.

  • Scope in plain words

    What is removed, what is installed, what is left alone, with drawings.

  • A schedule around you

    Services, school terms and rentals first. Drilling and inside work in the gaps.

  • The insurance certificate

    Sent with the proposal, so the board does not have to ask.

  • Ground and air side by side

    Two options, each with its cost drivers, so the vote is informed.

  • The decision list

    What the board must approve, and who signs.

  • Who to call

    One named person for the building committee from site visit to start-up.

What drives the cost of a building.

  • Heating and cooling load

    Measured, not guessed, from the building’s size, age and use.

  • Number and depth of bores

    A larger load needs more of them, and more room around the building.

  • The existing distribution

    Radiators, a boiler loop or ducts, and what it takes to connect to them.

  • Phasing

    Doing a building in stages between uses can add to the cost but keeps it open.

  • Permits and approvals

    Any approvals a board, a diocese or a school district needs first.

  • Restoration

    Parking, play areas and gardens put back after drilling.

Questions from boards.

Can you work around our services or school year?

Yes. We plan the drilling and the inside work around your calendar and put the schedule in the proposal.

Do you give a quote in time for a budget meeting?

Tell us the date at the site visit. We say what we can finish by then and what has to be estimated.

What if the congregation cannot afford ground-source?

Then we write the air-source option fully and say so. A loop is only worth it if you will use it for many winters.

Ask for a proposal for your board.

Name your meeting date and we will work back from it.