Skip to content
Monday – Friday: 8 a.m. – 4:30 p.m. · Saturday – Sunday: ClosedMonday – Friday: 8 a.m. – 4:30 p.m.Section 608 technician certification · NY Certificate 000000VerifyLiability and workers’ compensation insurance
1 more license
  • Section 608 technician certification · NY Certificate 000000Verify
  • Liability and workers’ compensation insurance
(607) 555-0100

Ithaca, New York

The loop is the part you will see for two weeks and never again.

A ground loop is plastic pipe that carries water to the ground and back. It goes down in bores or out in a trench, connects to headers at the house, and is buried once it has been flushed and pressure-tested. After that it is a lawn.

Aerial view of a wooded suburban cul-de-sac with large houses

Two ways to lay a loop.

  • Vertical bores

    Holes a few hundred feet deep, a few feet apart in a row or a grid. They need little surface and cost more per foot to drill.

    • Best for small or sloped lots

    • Rig works from the drive or lawn

    • Bore depth depends on soil and rock

  • Horizontal trench

    Pipe laid in a trench a few feet down. It needs more open ground and less drilling.

    • Needs open lawn or a field

    • Excavator and trench to restore

    • Lower cost where the ground allows

What the drilling days are like.

  1. 01

    Step 1: The rig arrives

    A truck-mounted rig and a support truck need a path and a place to stand.

  2. 02

    Step 2: Drilling

    Noisy and muddy. Cuttings and water come up and are contained on site.

  3. 03

    Step 3: Pipe goes in

    The loop is lowered into each bore and grouted.

  4. 04

    Step 4: Connecting and testing

    We join the loops, flush the system and test the pressure.

  5. 05

    Step 5: Restoration

    Ruts are filled, the trench is closed and seed or sod goes down.

What we agree on before the rig comes.

  • The path

    Where the rig drives, and what is protected along the way.

  • The restoration

    What we repair, what we leave to you and what we do not touch.

  • Utilities

    Locating lines before any digging, and who calls it in.

Walk the lot with us.

Randolph marks the bores and the path with you at the site visit.